Completed Projects

Customer  -    International Energy Corporation (MEK)

Works performed

-         Installation of 110/35 kV "Sevan" HPP

-         Dismantling of  35 kV oil circuit breakers

-         Installation of 35 kV gas-insulated circuit breakers

-         Transportation of 47 tons cargo from Kanaker HPP to Gyumush HPP

 

------------------------------------------------------------------------------------------------------------

Customer  -    K-Telecom  (Vivacell)

Contractor  -    Intracom

Project        -    Installation of  towers - 6 pcs.

Works performed

-         Digging of foundations 8 x 8 x 5 m

-         Installation r / concrete foundations (monolith)

-         Assembly the tower with 35-42 m height of galvanized steel / Structure

-         Installation of tower to the foundation

-         Mounting and installation of diesel generators under these tower

-         Installation of communicational panels and cables

 

------------------------------------------------------------------------------------------------------------

Customer  -    “High Voltage Electrical Networks”

Project        -     Replacement of the burnt transformer with new 125,000 kVA one at 220 kV  "Marash ” substation

Works performed

-         Dismantling the burnt transformer

-         Manualy rigging to the trailer and transportation in the territory of Substation, unloading on the sleeper cell

-         Preparation and construction of a new NSP-3 foundation under the transformer

-         Unloading by manualy rigging and Installation of new 125,000 kVA transformer

-         Manufacturing and installation of SHAOT panels

-         Measurements, commissioning and testing

 

------------------------------------------------------------------------------------------------------------

 

Customer  -    “High Voltage Electrical Networks”

Project        -     Transportation of transformer from Vanadzor -2 substation to Yerevan

Works performed

-         Dismounting of 63000 kV transformer

-         Loading by manualy rigging

-         Transportation of transformer from Vanadzor to the 220kV Akhtanak substation in Yerevan

-         Unloading to the foundation and installation of transformer

 

------------------------------------------------------------------------------------------------------------

Customer  -    “Electrical Networks of Armenia”

Facility        -    TP - 581  in Yerevan

Works performed

-         Construction of  TP – 1*630 kVA substation building

-         Mounting and installation of 630 kVA transformer

-         Manufacturing and installation of 1 section 10kV feeder KSO-10 and SHO-70 Panels

-         transfer of all cable lines and connect to new customers

 

------------------------------------------------------------------------------------------------------------

Customer  -    “Hidroenergoshin”

Facility        -    TP - 2 х 400 kVA  in Davidashen st.  and  TP - 2 х 400 kVA in Babajanyan st. , Yerevan

Works performed

-         Manufacturing and installation of  2 section 10kV feeder KSO-10 and SHO-70 Panels

-         Installation and adjustment of Automatic Reserve Panel

-         Installation of 400 kVA transformer

 

------------------------------------------------------------------------------------------------------------

Customer  -    “High Voltage Electrical Networks”

Project        -     Repair of transformers in 220 kV  “Gyumri” substation - 125000 kVA

and  32000 kVA   and in “Шаумян-2” substation  -  125000 kVA

        Works performed

-         Dismounting insulators and cooling system

-         Replace all rubber pads

-         repair and inspections of electric motors, valves, safety valves

-         Repair of the tap changer

-         Revision and adjustment of gas relay

-         External Painting

-         Degasing and dring of transformer oil

-         Adjustment and integrated measurement

Customer  -    International Energy Corporation (MEK)

Works performed

-         Installation of 110/35 kV "Sevan" HPP

-         Dismantling of  35 kV oil circuit breakers

-         Installation of 35 kV gas-insulated circuit breakers

-         Transportation of 47 tons cargo from Kanaker HPP to Gyumush HPP

 

------------------------------------------------------------------------------------------------------------

Customer  -    K-Telecom  (Vivacell)

Contractor  -    Intracom

Project        -    Installation of  towers - 6 pcs.

Works performed

-         Digging of foundations 8 x 8 x 5 m

-         Installation r / concrete foundations (monolith)

-         Assembly the tower with 35-42 m height of galvanized steel / Structure

-         Installation of tower to the foundation

-         Mounting and installation of diesel generators under these tower

-         Installation of communicational panels and cables

 

------------------------------------------------------------------------------------------------------------

Customer  -    “High Voltage Electrical Networks”

Project        -     Replacement of the burnt transformer with new 125,000 kVA one at 220 kV  "Marash ” substation

Works performed

-         Dismantling the burnt transformer

-         Manualy rigging to the trailer and transportation in the territory of Substation, unloading on the sleeper cell

-         Preparation and construction of a new NSP-3 foundation under the transformer

-         Unloading by manualy rigging and Installation of new 125,000 kVA transformer

-         Manufacturing and installation of SHAOT panels

-         Measurements, commissioning and testing

 

------------------------------------------------------------------------------------------------------------

 

Customer  -    “High Voltage Electrical Networks”

Project        -     Transportation of transformer from Vanadzor -2 substation to Yerevan

Works performed

-         Dismounting of 63000 kV transformer

-         Loading by manualy rigging

-         Transportation of transformer from Vanadzor to the 220kV Akhtanak substation in Yerevan

-         Unloading to the foundation and installation of transformer

 

------------------------------------------------------------------------------------------------------------

Customer  -    “Electrical Networks of Armenia”

Facility        -    TP - 581  in Yerevan

Works performed

-         Construction of  TP – 1*630 kVA substation building

-         Mounting and installation of 630 kVA transformer

-         Manufacturing and installation of 1 section 10kV feeder KSO-10 and SHO-70 Panels

-         transfer of all cable lines and connect to new customers

 

------------------------------------------------------------------------------------------------------------

Customer  -    “Hidroenergoshin”

Facility        -    TP - 2 х 400 kVA  in Davidashen st.  and  TP - 2 х 400 kVA in Babajanyan st. , Yerevan

Works performed

-         Manufacturing and installation of  2 section 10kV feeder KSO-10 and SHO-70 Panels

-         Installation and adjustment of Automatic Reserve Panel

-         Installation of 400 kVA transformer

 

------------------------------------------------------------------------------------------------------------

Customer  -    “High Voltage Electrical Networks”

Project        -     Repair of transformers in 220 kV  “Gyumri” substation - 125000 kVA

and  32000 kVA   and in “Шаумян-2” substation  -  125000 kVA

        Works performed

-         Dismounting insulators and cooling system

-         Replace all rubber pads

-         repair and inspections of electric motors, valves, safety valves

-         Repair of the tap changer

-         Revision and adjustment of gas relay

-         External Painting

-         Degasing and dring of transformer oil

-         Adjustment and integrated measurement